Grinder put into the middle

Our client Vliko (now Renewi) was looking for a solution to process 100,000 tons of C&D and C&I waste per year, without wet separation. Waltec took on this challenge.

Materials:
  • Construction
  • Demolition
  • Industrial
  • Bulky

One plus one equals two

We realized a working system by combining two existing processes: the ‘Wal-street’ air system, that proved its effectiveness in Australia, and the grinding process, which we put into the middle of the production line for the first time. Within one process we separate rubble, wood and light fraction. In addition, foil, paper and cardboard waste stays large enough to get easily sorted.

The installation works better than esteemed and guaranteed.

01
02
03
04
05
06
07
08

Practical waste solutions

Waltec is specialized in the design and supply of installations for industrial, bulky, construction and demolition waste. With these installations, we reduce labour costs and or improve product quality, to prepare recyclable materials.

100

thousand tons of C&D and C&I waste per year to be separated

Get in touch