One installation that does it all
Greenstar needed one installation. One installation, that could process 35 tons of C&I and 100 tons of C&D per hour, with a maximum recovery (separation output) without grinder.
Expectations versus outcome
The combination of 3D screen, air system and water bath separator was extremely appealing to Greenstar. At the moment, the installation operates full time with higher recovery than predicted.
For companies that want maximum recovery of products such as wood, rubble, sand, metal, paper, and plastic, this system is the ideal solution.
Practical waste solutions
Waltec is specialized in the design and supply of installations for industrial, bulky, construction and demolition waste. With these installations, we reduce labour costs and or improve product quality, to prepare recyclable materials.
visit to the waste sorting installation in Boston was enough for Greenstar to decide they needed this Waltec solution too